Projects · Sultanate of Oman

ProjectsNational infrastructure delivered across Oman.

Highlighted Projects

Eight active programmes.
Engineered delivery.

All scope of works, locations, lengths and contract details for the eight projects shown below are taken directly from Rawasi's internal company project PowerPoints — nothing has been inferred or generated.

01 / 08
RRS/317 01 / 08 In Progress
Adam–Thumrait dualization works Haima — Adam–Thumrait Corridor
Dualization · National Highway

Adam–Thumrait Road Dualization, Part 3

Construction of 67.5 km dualization of the Adam–Thumrait road (Part 3) including 3 major underpasses, box and pipe culverts, protection works and road furniture, with supply and laying of ABC and asphalt for 132.5 km from Haima to Mukshin.

Among Rawasi's largest active contracts by value — a national highway dualization scope with structural underpasses, hydraulic structures and full pavement delivery across the Haima–Mukshin corridor in Al Wusta Governorate.

EmployerMTC&IT
LocationHaima · Al Wusta
Commenced29 April 2025
Total Length132.5 KM
Scope of works

The scope of work includes construction of 67.5 km dualization of the Adam–Thumrait road (Part 3) including 3 major underpasses, box and pipe culverts, protection works and road furniture, and supply and laying of ABC and asphalt for 132.5 km from Haima to Mukshin.

Dualization3 UnderpassesCulvertsABC & AsphaltProtection Works
RRS/275 02 / 08 In Progress
Khasab–Daba mountain road, Musandam Musandam — Daba & Lima Wadi
Mountain Corridor · Musandam

Khasab–Daba Road & Link to Lima

20.3 km of mountain road construction on the Daba and Lima Wadi sections — culverts, protection works, ditch lining, utility relocations, broadband works and street lighting.

A demanding Musandam Peninsula scope delivered jointly with Rimal Global Technical Services, executed across coastal-mountain terrain where engineered protection and disciplined logistics drive programme certainty.

EmployerMTC&IT
LocationMusandam
Commenced1 Feb 2024
Total Length20.3 KM
Scope of works

Construction of 20.3 km of mountain road including culverts, protection works, ditch lining, utility relocations, broadband works and street lighting — joint delivery with Rimal Global on the Daba and Lima Wadi sections.

Mountain RoadCulvertsDitch LiningStreet LightingBroadband
RRS/306 03 / 08 In Progress
Daba Section road construction, Musandam Musandam — Daba Section · Ch 51+600 → 65+084
Heavy Civils · Musandam

Daba Section — 36 box culverts

13.4 km of mountain road from Ch 51+600 to 65+084 — incorporating 36 box culverts, protection works, ditch lining, utility relocations and broadband infrastructure.

A structurally heavy Musandam scope demanding precise box-culvert sequencing and disciplined utility management across active mountain terrain.

EmployerMTC&IT
LocationMusandam
Commenced1 Aug 2024
Total Length13.4 KM
Scope of works

Construction of 13.4 km of road including 36 box culverts, protection works, ditch lining, utility relocations and broadband works — Daba Section chainage 51+600 to 65+084.

36 Box CulvertsProtection WorksDitch LiningUtilities
RRS/305 04 / 08 In Progress
Khasab–Daba ABC and asphalt works Musandam — Dibba · Lima · Khasab
Pavement Works · Musandam

Khasab–Daba ABC & Asphalt

52 km of pavement construction supplying and laying Aggregate Base Course (ABC), asphalt and road marking — connecting Dibba, Lima and Khasab in Musandam Governorate.

A complementary pavement-led package on the Khasab–Daba corridor, delivering quality-controlled ABC and asphalt across the peninsula's strategic mountain network.

EmployerMTC&IT
LocationMusandam
Commenced1 Sep 2024
Total Length52 KM
Scope of works

Supply and laying of ABC and asphalt including road marking for 52 km of road connecting Dibba, Lima and Khasab in Musandam Governorate.

ABCAsphaltRoad MarkingMountain Pavement
RRS/274 05 / 08 In Progress
Harweeb–Mitan border road, Dhofar Salalah — Harweeb to Mitan
Border Road · Dhofar

Harweeb–Mitan Asphalt Road

200 km of new asphalt road across Oman's southern frontier — supply and laying of ABC and asphalt with road marking from Harweeb to Mitan in Salalah, Dhofar Governorate.

Among Rawasi's longest single-corridor scopes, executed across remote desert terrain where logistics, mobilisation and disciplined site management drive programme delivery.

EmployerMTC&IT
LocationSalalah · Dhofar
Commenced13 Oct 2022
Total Length200 KM
Scope of works

Supply and laying of ABC and asphalt including road marking for 200 km of border road from Harweeb to Mitan, Salalah, Dhofar Governorate.

200 km CorridorABCAsphaltRoad MarkingRemote Mobilisation
RRS/320 06 / 08 In Progress
Sultan Haitham City roads, Phase 1 Muscat — Sultan Haitham City
Urban Development · Muscat

Sultan Haitham City — Phase 1, WP4

Construction of primary and secondary roads — Phase 1, Work Package 4 of Sultan Haitham City — covering 20 km of new urban infrastructure with ABC and asphalt (60/70 + PMB grades) including road marking.

A flagship national development for the Ministry of Housing, requiring tightly programmed delivery and pavement quality across the new city's primary road network.

EmployerMinistry of Housing
LocationMuscat
Commenced23 Jul 2025
Total Length20 KM
Scope of works

Supply and laying of ABC and asphalt (60/70 and PMB grades) including road marking for 20 km of primary and secondary roads — Phase 1, Work Package 4 of Sultan Haitham City.

Primary & SecondaryABC60/70 & PMBRoad Marking
RRS/352 07 / 08 In Progress
Muscat asphalt supply 2026 — Vögele paver and Rawasi crew laying fresh asphalt surfacing on a Muscat residential street Muscat Governorate — 2026 Programme
Asphalt Supply & Laying · Muscat

Muscat Asphalt Supply & Laying 2026

Supply and laying of asphalt surfacing across Muscat Governorate for the 2026 programme — paving new roads and maintaining existing networks at sites dispersed throughout the governorate.

A municipality-wide framework drawing on Rawasi's plant network, field testing capability and paving crews to deliver consistent asphalt surfacing across diverse urban sites.

EmployerMuscat Municipality
LocationMuscat
Commenced9 April 2026
Programme2026 Framework
Scope of works

Supply and laying of asphalt surfacing on prepared road sub-base across Muscat Governorate. Sites dispersed throughout the governorate, with paved lengths varying between new construction and maintenance scopes.

Supply & LayingAsphalt SurfacingMulti-SiteMaintenanceNew Roads
RRS/326 08 / 08 In Progress
Oman Palm Development link road, Al Dakhiliyya Nizwa — Oman Palm Development Co.
Design & Build · Al Dakhiliyya

Oman Palm Link Road

Design and construction of a new 3.75 km link road for the Oman Palm Development Company in Al Dakhiliyya — single carriageway, 3.5 m lanes with 1.5 m shoulders, including utility relocation, protection and drainage works.

An end-to-end design-and-build scope, delivered for the Ministry of Transport, Communications and Information Technology in the heart of Oman's interior — engineering oversight by ViA International.

EmployerMTC&IT
EngineerViA International
LocationNizwa
Commenced6 Aug 2025
Total Length3.75 KM
Scope of works

Design and construction of a new link road for the Oman Palm Development Company. Single carriageway with 3.5 m lane width each direction and 1.5 m outer shoulder, total length 3.75 km including utility relocation, protection and drainage works.

Design & BuildSingle CarriagewayUtility RelocationDrainage
Completed Projects

Major projects delivered
across the Sultanate.

A working selection of major roadworks, asphalt and infrastructure scopes delivered by Rawasi for government, industrial and energy clients.

# Project Client Length
01Engineer-3 Project · Civil Works for Package 1, Asphalt WorksMinistry of Defence214km
02Supply & Laying of Asphalt in Muscat Governorate (DGB/036/24)Muscat Municipality100.5km
03Asphalt Works at Various Sites In & Around BarkaSAM International64.2km
04Asphalt for In-House Road Construction at Seeb, Bousher & Muttrah (DGB/009/20)Muscat Municipality51.7km
05Asphalt Surfacing for In-House Road Construction at Bousher & Al Seeb (DGB/032/16)Muscat Municipality46km
06Asphalt Works for Subdivisional Areas in Various LocationsSAM International44.5km
07Asphalt Works at Various Sites In & Around Barka — 2024SAM International42km
08Asphalt Resurfacing of Water Stagnation Areas at Different Locations in Muscat (DGB/005/20)Muscat Municipality40km
09Asphalt Works In & Around Barka, Suwayq & Khabourah — 2025SAM International36km
10Asphalt for In-House Road Construction at Al Amerat & Quriyat (DGB/010/20)Muscat Municipality29km

Showing 10 of 26 · Sorted by length · Source: Rawasi project records

Trusted Partners

Public & private clients across Oman.

Muscat Municipality
Ministry of Defence
Ministry of Housing & Urban Planning
Petroleum Development Oman
Sultan's Special Force
Oman Aluminium Rolling Company
Sohar Port Services
Sarooj Construction
Galfar Engineering
Shell Oman
(09) — Build with Rawasi

Discuss your infrastructure
programme.

Speak to Rawasi about national roadworks, asphalt supply, civil packages or specialist infrastructure scopes — anywhere in the Sultanate.